TITLE Location Total Cost SOURCE OF FUND
Concreting of Unpaved Road Section at Purok 2 in Capagaypayan Capagaypayan 500,000.00 20% DF
Construction of Road Shoulder at Purok Fideleon in Poblacion Poblacion 700,000.00 20% DF
Concreting of Unpaved Road Section at Purok 3 in San Jose San Jose 500,000.00 20% DF
Concreting of Unpaved Road Section at Purok Liwliwa (ASHS Road in San Isidro Sur) San Isidro Sur 2,572,141.33 ADM
Concreting of Unpaved Road Section at Purok 4 in Sta. Lina Sta. Lina 2,474,404.83 ADM
Concreting of Unpaved Road Section at Purok Sinamar in San Gregorio San Gregorio 2,474,404.83 ADM
Drainage Excavation along Agungan Creek – Phase I San Gregorio 1,300,000.00 LDRRMF
Drainage Excavation along Kadaanan to Poblacion, Capagaypayan Poblacion-Capagaypayan 500,000.00 LDRRMF
Vegetation Control and Maintenance of Luna-Abulog Secondary Floodway Luna-Abulog 150,000.00 LDRRMF
Construction of Multipurpose Center/Evacuation Center at Barangay Bacsay – Phase II Bacsay 500,000.00 LDRRMF
Construction of Multipurpose Building /Evacuation Center at Barangay Cagandungan Cagandungan 600,000.00 LDRRMF
Construction of Multipurpose Center/Evacuation Center at Barangay San Sebastian – Phase II San Sebastian 566,275.51 LDRRMF